LIVIO BUILDING SYSTEMS INC.

Design Your AI Factory
in Under 5 Minutes

The world's first parametric AI data centre configurator — instant technical specifications, campus layouts, equipment schedules and a full PDF report, all tailored to your exact requirements.

Instant Full DesignComplete technical output the moment you finish your selections — no waiting, no forms, no guesswork.
🏗
Scaled Campus DiagramProportional block layout of your entire AI factory campus, building by building, with real dimensions.
📋
Full Equipment ScheduleTransformers, generators, UPS, chillers, CRAH, CDU and RPP counts — all precisely calculated.
🖥
GPU & Server PlatformNVIDIA GPU and SMCI server specification matched automatically to your rack density selection.
📐
Physical DimensionsExact building lengths, campus area in m², acres and hectares — ready for your site planning team.
📄
PDF Report to Your InboxA full branded configuration report emailed to you instantly after email verification.
Step 1 — Choose your facade cladding and watch the building come alive in real time
Step 2 — Set capacity, tier, modularity, rack density and security series
Step 3 — Get your complete AI Factory design output instantly on screen
Step 4 — Export a full PDF report — emailed directly to your inbox
Takes approximately 3–5 minutes  ·  No signup required to explore
LIVIO

AI FACTORY CONFIGURATOR

PARAMETRIC DESIGN ENGINE // v5.0

v5.0
● LIVE CONFIG
VALIDATION DISCLAIMER — Outputs are preliminary estimates for planning and budgetary purposes only. They do not constitute a final engineering design. All configurations must be reviewed, validated and approved by a qualified LIVIO engineer before procurement, construction or deployment.
01CLADDING
02CAPACITY
03TIER
04MODULARITY
05DENSITY
06SECURITY
07RESULT
Facade ACP Cladding
Select your Aluminium Composite Panel finish for Zone A (upper 70%) and Zone B (lower 30%). The live preview updates instantly as you select.
Live Facade Preview
ZONE A — UPPER (70%)
ZONE B — LOWER (30%)
Zone A: — not selected —
Zone B: — not selected —
Zone A — Upper Facade (70%)
Top 70% · above datum line
Zone B — Lower Facade (30%)
Bottom 30% · base and plinth zone
Total AI Factory Capacity
Define the total IT power load in megawatts for your campus. This drives the number of 1.25MW blocks and buildings required.
Q1 What is the total AI Factory size (IT Load)?
10 MW
2.5 MW50100200500 MW
QUICK SELECT
ENTRY
10 MW
8 blocks
Entry-level AI factory
Ideal for initial deployment
MID
50 MW
40 blocks
Mid-scale campus
Regional AI infrastructure
LARGE
100 MW
80 blocks
Large-scale facility
National AI capability
POPULAR
MEGA
200 MW
160 blocks
Hyperscale AI campus
Sovereign-grade capacity
GIGA
500 MW
400 blocks
Giga-scale campus
National AI powerhouse
Uptime Tier Selection
Define the redundancy standard. This drives equipment multipliers, generator counts and cooling redundancy across the campus.
Q2 What Tier certification level do you require?
STANDARD
TIER II/III
Hybrid Redundancy
99.741% uptime
N+1 Power & Cooling
Concurrent maintainability
Generator: N+1 configuration
PREMIUM
FAULT TOLERANT
TIER IV
Full Fault Tolerance
99.995% uptime
2N Power & Cooling
Zero single point of failure
Generator: 2× per block
Modularity (MW Per Building)
Select the IT power output per individual building. Each building is a complete, standalone LIVIO AI Factory module. The campus scales by stacking buildings vertically.
Q3 What is your preferred building size (MW per building)?
MICRO
2.5 MW
per building
57.6m × 10m × 5m
Maximum campus flexibility
Compact deployment
MINI
5 MW
per building
80m × 10m × 5m
Regional deployment
Mid-size modular campus
POPULAR
MAX
10 MW
per building
140m × 10m × 5m
Standard AI factory
Optimal scale efficiency
MEGA
20 MW
per building
260m × 10m × 5m
Hyperscale facility
Maximum building footprint
Rack Power Density
Select the power density per rack. This determines your GPU platform, server configuration and rack count per building block. All LIVIO configurations use Direct Liquid Cooling (DLC).
Q4 What rack power density is required for your AI workloads?
STANDARD
25 kW
per rack · DLC
Direct Liquid Cooling
General compute workloads
50 racks per 1.25MW block
Cost-effective deployment
RECOMMENDED
HIGH DENSITY
150 kW
per rack · DLC
Direct Liquid Cooling
NVIDIA GB300 · SMCI NVL72
8 racks per 1.25MW block
LLM training & inference
MAX DENSITY
ULTRA HIGH
250 kW
per rack · DLC
Direct Liquid Cooling
NVIDIA B300 · SMCI HGX B300
5 racks per 1.25MW block
Next-gen AI infrastructure
Fine-tune Density (25–250 kW)
25 kW / rack
255075100125150175200225250 kW
Shell Security Series
Select the ballistic protection level for your AI Factory building shell — from standard commercial construction to sovereign-grade hardening.
Q5 What level of physical security does your facility require?
🏢
Commercial Series
Standard · No Ballistic Protection
Standard structural shell
Cost-effective solution
Conventional facade systems
No ballistic rating required
BEST FOR: Standard AI Data Centres
🛡
Shield A Series
UL 752 Level 3–5 · Handgun & Select Ballistic
Handgun-resistant cladding
Select threat resistance
Enhanced perimeter systems
UL 752 Level 3–5 rated
BEST FOR: Financial AI Facilities
Shield B Series
UL 752 Level 8 · High-Grade Ballistic Resistance
High-calibre resistance
Assault rifle protection
Military-grade shell systems
UL 752 Level 8 rated
BEST FOR: National AI Infrastructure
🔰
Shield C Series
UL 752 Level 10 · Maximum Ballistic Resistance
Maximum ballistic protection
Heavy weapons resistance
Sovereign-grade hardening
UL 752 Level 10 rated
BEST FOR: Sovereign AI Infrastructure
AI Factory Full Design Output
Parametric engine output · Scaled campus block diagram · Physical dimensions · Equipment schedule · Power & cooling systems
BLOCK DIAGRAM
COMPUTE
POWER
COOLING
PHYSICAL
Scaled campus layout — vertical stack configuration. Each building shown proportional to actual dimensions.
// COMPUTE SPECIFICATION
// RACK CALCULATION
// POWER SYSTEM SIZING
// POWER DISTRIBUTION COUNTS
// COOLING SYSTEM
// COOLING PER BLOCK
// BUILDING DIMENSIONS
// CAMPUS SUMMARY

Generating Your Report

Building your personalised AI Factory configuration report...

Preparing...

Get Your PDF Report

Fill in your details below. A 6-digit verification code will be sent to your work email, then your full PDF report is emailed to you instantly.
📧 Work email required — personal addresses (Gmail, Yahoo, Hotmail etc.) are not accepted. Your PDF report will be emailed to you after verification.

Check Your Email

A 6-digit verification code has been sent to
Your Verification Code
⚠ Shown on-screen because email delivery failed (usually a local file restriction).
On Netlify, this code will arrive in your inbox instead.
Code expires in 60s

Report on Its Way!

Your PDF is downloading now and has been emailed to


Our engineering team will be in touch within 2 business days.

Note: The PDF downloads locally to your device. The emailed report contains your full configuration summary.